General News

Aburi – Ayi Mensah highway opened temporarily to vehicular traffic

The Ghana Highway Authority (GHA) has temporarily opened the Accra bound carriageway from the Peduase Lodge to Ayi  Mensah on the Aburi – Accra road to vehicular traffic.

The Ghana Highway Authority closed that section of the road in October 2019 due to some slope failures and rock falls, with potential for further rock falls and slope failures.

Consequently, the Ayi Mensah to Aburi-bound double carriageway was been turned into a single carriageway to enable traffic flow to and from Aburi and beyond.

But in a press statement, the GHA said the road is being opened temporarily on Saturday December 28, 2019, for use during the festive season.

“The Ghana Highway Authority wishes to inform the general public, especially motorist using the Aburi Road that, the South-bound lane; Peduase to Ayi Mensah section which was closed to the public due to slopes failure is OPENED for use during this festive season from Saturday 28th December 2019 to 30th January 2020.”

“While we want to assure the Public that work is underway to ensure repair works begin soon on the Slopes, motorists are entreated to drive with caution and respect road regulations. We are counting on your usual cooperation.”

|Graphic Online

Tags
Show More

GWO

Ghanaweb Onine is dedicated to bringing you news from various media groups in Ghana,Africa and around the world to keep you informed and educated as you go about your daily lives. Disclaimer: The views of each article are the sole responsibility of the author and do not reflect that of Ghana web online.We are not responsible for any misinformation or incorrect statement. If you need any more clarification on an article please direct them to the original source.All contents belong to their respective owners we do not own it.

Related Articles

Back to top button
Close